Once the platform has been raised and the edge of the dock leveller has been put against the caisson of the truck, it follows the lifting and dropping of the means (according to the operation that the operator is carrying out: if during loading or unloading), as well as any unbalanced side load by carrying out a torsion of up to 100mm