This extension to the existing Hangar 12 at Bournemouth Airport has a clear span of 100m, is 12m deep and 22m high to the eaves. The main contractor’s work started on this project in the summer of 2013 and we commenced assembly of the main truss at the beginning of October 2013.
Once the pre-assembly work had been carried out, it was then time for the 140T truss to be lifted into position, using a 500T and a 1000T crane. Due to the ever-changing weather, the procedure, originally being delayed by two weeks, was then brought forward 24 hours to take advantage of a perfectly still day. With the help of our suppliers, Civils and Bournemouth International Airport, we were given the green light to go ahead with the lift, which was witnessed by the Designer, Richard Callaghan and Draughtsman, Steve Roberts.
Once all the steelwork and cladding was completed the Megadoor was installed.